Почетна 5 News 5 Assemblies 5 Hydroelectric Power Plants on the Drina River a.d. Višegrad – Proxy report from the regular shareholders’ meeting

Hydroelectric Power Plants on the Drina River a.d. Višegrad – Proxy report from the regular shareholders’ meeting

10.12.2025. | Assemblies, News

ATTACHMENT:

Contact

Bana Milosavljevica 8
78000 Banja Luka

+387 (0)51 228 480

+387 (0)51 228 488